First Response Group logo

Case Studies

FRG - First Response Group

Case studies

Infrastructure Water
Chalton Water Recycling Center Upgrade: Integrated Site Solutions
As part of a £20million upgrade to build Europe’s largest Tertiary Treatment Facility at the Water Recycling Centre (WRC) in Chalton, near Luton, @one Alliance . . .
View Case Study
Infrastructure Rail
Crossrail C305
DSJV were looking to engage a security provider with understanding of dealing with an integrated security approach on multiple sites as part of the Crossrail delivery requirements.
View Case Study
Infrastructure Construction
Deepcut Barracks Redevelopment Project
SKANSKA required a round the clock security solution to protect a site building housing essential IT and data equipment and the public area surrounding it. In addition to the threat of . . .
View Case Studye
Public Healthcare
Access Control System Replacement
The swipe card Access Control System at Royal Hallamshire Hospital, Weston Park Cancer Centre, Jessop Wing Maternity Unit and Sheffield Children’s Hospital had been run to . . .
View Case Study
Commercial Property Industrial
Head Office Integrated Fire and Security System
FRG was tasked with designing a bespoke state of the art full service security system for the site including fire detection, external and internal monitoring and intruder alert . . .
View Case Study

Contact us

For more information please call our head office on ‭0330 124 5670

Head Office: Unit 2, Gemini Business Park, Sheepscar Way, Leeds LS7 3JB

© 2018, First Response Group Ltd all rights reserved.
Website by Plum Design